Gardenville Project
Civil / Site Work
Project was based in West Seneca, NY. It is an expansion project at the existing National Grid substation. Our scope of work included preparing the site expansion area, installing 288 concrete structures including drilled pier foundations and equipment pads, installing ground grid and duct bank throughout new area, demo and remove existing structures, installing stone and compacting in levels to achieve desired compaction. Final yard stone installed along with adding wetland mitigation ponds.
Learn Moreabout Gardenville Project -
-
Willard Drug Treatment Center
Boring
Project consisted of excavating for new electrical duct bank, installing new electrical manholes and the complete site restoration once completed throughout facility. A portion of the new duct bank was to be run beneath the perimeter fence resulting in underground boring in order to maintain security.
Learn Moreabout Willard Drug Treatment Center -
-
Five Mile Station
Civil / Site Work
Project was based in Humphrey, NY. This was a new build substation for National Grid. Work consisted of stripping the site and using a cut/fill of more than 6 feet, installing nearly 300 drilled pier foundations, oil containment system, ground grid, cable trench, final yard stone and all site restoration of project while maintaining compliance with the mandates of Article 7.
Learn Moreabout Five Mile Station -
-
Laona Switchyard Project
Civil / Site Work
This project was based in Fredonia NY and was a greenfield project. Our work involved existing site cut/fill, installation of 76 drilled pier cassions, installation of 750 ft of cable trench, installation of 7000 LF of ground grid, installation of all site and perimeter drainage, final yard stone and perimeter grading. This project was completed in full compliance with Article 7.
Learn Moreabout Laona Switchyard Project
-
Gardenville Project
Civil / Site Work
Project was based in West Seneca, NY. It is an expansion project at the existing National Grid substation. Our scope of work included preparing the site expansion area, installing 288 concrete structures including drilled pier foundations and equipment pads, installing ground grid and duct bank throughout new area, demo and remove existing structures, installing stone and compacting in levels to achieve desired compaction. Final yard stone installed along with adding wetland mitigation ponds.
Learn Moreabout Gardenville Project -
Five Mile Station
Civil / Site Work
Project was based in Humphrey, NY. This was a new build substation for National Grid. Work consisted of stripping the site and using a cut/fill of more than 6 feet, installing nearly 300 drilled pier foundations, oil containment system, ground grid, cable trench, final yard stone and all site restoration of project while maintaining compliance with the mandates of Article 7.
Learn Moreabout Five Mile Station -
Laona Switchyard Project
Civil / Site Work
This project was based in Fredonia NY and was a greenfield project. Our work involved existing site cut/fill, installation of 76 drilled pier cassions, installation of 750 ft of cable trench, installation of 7000 LF of ground grid, installation of all site and perimeter drainage, final yard stone and perimeter grading. This project was completed in full compliance with Article 7.
Learn Moreabout Laona Switchyard Project
-
Willard Drug Treatment Center
Boring
Project consisted of excavating for new electrical duct bank, installing new electrical manholes and the complete site restoration once completed throughout facility. A portion of the new duct bank was to be run beneath the perimeter fence resulting in underground boring in order to maintain security.
Learn Moreabout Willard Drug Treatment Center